B300 vs B200: which node should you reserve?

The B300 has 60% more memory per GPU (288 GB vs 180 GB) and 1.7× the dense FP4 compute. On Avian's 12-month term it costs 15% more per GPU-hour ($4.95 vs $4.32), which makes it 28% cheaper per GB of GPU memory. Prices as of October 2026.

Specs side by side

Per GPU unless noted. Both ship as complete 8-GPU HGX nodes with NVLink across all eight.

NVIDIA B200NVIDIA B300
ArchitectureBlackwellBlackwell Ultra
GPU memory180 GB HBM3e288 GB HBM3e
Memory per 8-GPU node1,440 GB2,304 GB
Memory bandwidth8 TB/s8 TB/s
Dense NVFP49 PFLOPS15 PFLOPS
NVLink1.8 TB/s1.8 TB/s
Power1,000 W1,400 W
Host memory per node2 TB+3 TB+

Reserved price by term

Per GPU-hour, prepaid for the whole term and locked from the day you reserve. Per-node figures are for one 8-GPU node per month (730 hours).

TermB200 / GPU-hrB300 / GPU-hrB300 premiumB200 node / monthB300 node / month
1 Month (sold out) $5.40 $5.40 0% $31,536 $31,536
3 Months (sold out) $4.95 $5.25 6% $28,908 $30,660
6 Months (sold out) $4.77 $5.15 8% $27,857 $30,076
12 Months $4.32 $4.95 15% $25,229 $28,908
24 Months $3.87 $4.59 19% $22,601 $26,806
3 Years $3.42 $4.23 24% $19,973 $24,703

What you get per dollar

On the 12-month term. Memory usually decides how many nodes a model needs; FP4 compute decides how fast it serves.

B200B300
Price per GB of GPU memory, per hour$0.0240$0.0172
Price per dense NVFP4 PFLOP, per hour$0.48$0.33
Price per GPU-hour$4.32$4.95

Which one to reserve

If you can't decide from the lists below, the GPU memory calculator shows whether your model fits on each node.

Reserve the B300 if

  • Your model doesn't fit in 1,440 GB, or only fits with little room for KV cache.
  • You serve long contexts or many concurrent requests, where memory goes to KV cache.
  • You run FP4 inference and want the most throughput per node.
  • One B300 node replaces two B200 nodes for your model.

Reserve the B200 if

  • Your model fits comfortably in 1,440 GB with room to spare.
  • You train or fine-tune mid-size models where memory isn't the limit.
  • The lowest cost per node matters more than memory per GPU.
  • You want the longest track record: the B200 has been in production longer.

Reserve the node that fits

B300 from $4.23 and B200 from $3.42 per GPU-hour, prepaid and rate-locked.